Lime Plastering Contract Clancy Quay Dublin

 

 For this Lime Plastering Project we had  to  Install Insulation and Lime finish.

The Building is a old Army Barracks in Clancy Quay North Dublin that is been converted into a appartment complex.

The exsisting Lime Walls all needed to be prepared for Pavadentro Wood Chip Insulated  Fibre Board.

 We first had to apply a Lime Render leveling coat to the exsisting walls,

We fitted a Pavadentro wood fibre fully breathable Insulation board.

We then Meshed and Coated the walls with a fully breathable Lime Product and finished off with a Lime Skim.